• Subscribe Now
  • Subscriber Login
  • My Account
Huntsville Business Journal
  • Link to Facebook
  • Link to X
  • Link to Mail
  • Link to Rss this site
  • News
  • Small Business
  • People
  • Real Estate
  • Government
  • Finance
  • Technology
  • Contact
  • EVENT Magazine
  • Best of Huntsville
  • Menu Menu
staff reports

Liftoff! NASA’s Artemis I Mega Rocket Launches Orion to Moon

November 17, 2022/in Community Development, Development, Engineering, Events, Featured, Lead, NASA, News, People, Science, Space, Success, Technology/by staff reports

Following a successful launch of NASA’s Space Launch System (SLS), the most powerful rocket in the world, the agency’s Orion spacecraft is on its way to the Moon as part of the Artemis program. Carrying an uncrewed Orion, SLS lifted off for its flight test debut at 1:47 a.m. EST Wednesday from Launch Pad 39B at NASA’s Kennedy Space Center in Florida.

The launch is the first leg of a mission in which Orion is planned to travel approximately 40,000 miles beyond the Moon and return to Earth over the course of 25.5 days. Known as Artemis I, the mission is a critical part of NASA’s Moon to Mars exploration approach, in which the agency explores for the benefit of humanity. It’s an important test for the agency before flying astronauts on the Artemis II mission.

“What an incredible sight to see NASA’s Space Launch System rocket and Orion spacecraft launch together for the first time. This uncrewed flight test will push Orion to the limits in the rigors of deep space, helping us prepare for human exploration on the Moon and, ultimately, Mars,” said NASA Administrator Bill Nelson.

After reaching its initial orbit, Orion deployed its solar arrays and engineers began performing checkouts of the spacecraft’s systems. About 1.5 hours into flight, the rocket’s upper stage engine successfully fired for approximately 18 minutes to give Orion the big push needed to send it out of Earth orbit and toward the Moon.

Orion has separated from its upper stage and is on its outbound coast to the Moon powered by its service module, which is the propulsive powerhouse provided by ESA (European Space Agency) through an international collaboration.

“It’s taken a lot to get here, but Orion is now on its way to the Moon,” said Jim Free, NASA deputy associate administrator for the Exploration Systems Development Mission Directorate. “This successful launch means NASA and our partners are on a path to explore farther in space than ever before for the benefit of humanity.”

Over the next several hours, a series of 10 small science investigations and technology demonstrations, called CubeSats, will deploy from a ring that connected the upper stage to the spacecraft. Each CubeSat has its own mission that has the potential to fill gaps in our knowledge of the solar system or demonstrate technologies that may benefit the design of future missions to explore the Moon and beyond.

Orion’s service module will also perform the first of a series of burns to keep Orion on course toward the Moon approximately eight hours after launch. In the coming days, mission controllers at NASA’s Johnson Space Center in Houston will conduct additional checkouts and course corrections as needed. Orion is expected to fly by the Moon on Nov. 21, performing a close approach of the lunar surface on its way to a distant retrograde orbit, a highly stable orbit thousands of miles beyond the Moon.

“The Space Launch System rocket delivered the power and performance to send Orion on its way to the Moon,” said Mike Sarafin, Artemis I mission manager. “With the accomplishment of the first major milestone of the mission, Orion will now embark on the next phase to test its systems and prepare for future missions with astronauts.”

The SLS rocket and Orion spacecraft arrived at Kennedy’s Launch Pad 39B on Nov. 4 where they rode out Hurricane Nicole. Following the storm, teams conducted thorough assessments of the rocket, spacecraft, and associated ground systems and confirmed there were no significant impacts from the severe weather.

Engineers previously rolled the rocket back to the Vehicle Assembly Building (VAB) Sept. 26 ahead of Hurricane Ian and after waving off two previous launch attempts Aug. 29 due to a faulty temperature sensor, and Sept. 4 due to a liquid hydrogen leak at an interface between the rocket and mobile launcher. Prior to rolling back to the VAB, teams successfully repaired the leak and demonstrated updated tanking procedures. While in the VAB, teams performed standard maintenance to repair minor damage to the foam and cork on the thermal protection system and recharge or replace batteries throughout the system.

Artemis I is supported by thousands of people around the world, from contractors who built Orion and SLS, and the ground infrastructure needed to launch them, to international and university partners, to small businesses supplying subsystems and components.

Through Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone for astronauts on the way to Mars.

Related Stories:

  • Rocket City Aviation Services lands at Pryor Field

    Rocket City Aviation Services lands at Pryor Field

  • PDW to acquire New York communications engineering...

    PDW to acquire New York communications engineering...

  • Auburn and MTSU aim to engineer a classic in the R...

    Auburn and MTSU aim to engineer a classic in the R...

Tags: Artemis, City of Huntsville, Kennedy Space Center, Marshall Space Flight Center, NASA, SLS
Share this entry
  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share on Tumblr
  • Share on Reddit
  • Share by Mail
https://huntsvillebusinessjournal.com/wp-content/uploads/2022/11/Liftoff-NASAs-Artemis-I-Mega-Rocket-Launches-Orion-to-Moon.jpg 316 833 staff reports https://huntsvillebusinessjournal.com/wp-content/uploads/2019/02/HBJ-Logo.png staff reports2022-11-17 08:36:162022-11-17 08:36:14Liftoff! NASA’s Artemis I Mega Rocket Launches Orion to Moon
You might also like
Looking back on a record year for the Von Braun Center
Bank Independent announces new promotion aimed at enhancing customer relations
Inventory increase indicates potential thaw in market for the future
‘Trash Mountain’ a Modern Landfill Rising over Southwest Huntsville
Bank Independent Business Alabama Honors Bank Independent as One of the State’s Top Employers
From the Moon to Mars: NASA Marshall Space Flight Center Seeks Small Business Partners for Future Missions
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *

Search Search

Categories

Support Local Journalism - Subscribe today

Menu

  • Features
  • Events
  • People
  • Small Business
  • Government
  • Finance
  • Technology

Subscribers

Subscriber Login

My Account

Become a Subscriber

Sign Up For Newsletter

 

Contact Us

Advertise
Submit Your News
Distribution

EVENT Publishing
Huntsville Business Journal
600 Boulevard South #104
Huntsville, AL 35802

(256) 533-8078

Publisher:
todd@huntsvillebusinessjournal.com

Send Us Your News:
editor@huntsvillebusinessjournal.com

Site by PlayBig Design - Managed by IG Webs
  • Link to Facebook
  • Link to X
  • Link to Mail
  • Link to Rss this site
  • Subscribe Now
  • Subscriber Login
  • My Account
Link to: Para-cycling Returning to City with Larger Event Link to: Para-cycling Returning to City with Larger Event Para-cycling Returning to City with Larger Event Link to: Understanding Key Differences in Banks vs Credit Unions Link to: Understanding Key Differences in Banks vs Credit Unions Understanding Key Differences in Banks vs Credit Unions
Scroll to top Scroll to top Scroll to top